Rooftop solar in Jalpaiguri and the Dooars

Tea factories, homes, hospitals and mills, next door to our Siliguri store.

Solarverse Solutions designs, installs and maintains rooftop solar across Jalpaiguri district and the Dooars from its store on Sevoke Road, Siliguri. We are an authorised Waaree channel partner, and a tea factory in Jalpaiguri district is one of the plants we are building right now.

Jalpaiguri at a glance

Electricity supplierWBSEDCL (West Bengal State Electricity Distribution Company)
Rooftop rulesWBERC rooftop solar (Prosumers) Regulations, 2025. Net metering from 1 kW up to 500 kW or your contract demand, whichever is lower. Surplus carries forward from bill to bill and resets to zero on 1 April.
Expected generation3.4 to 4.0 units per kWp a day on a shadow-free roof, about 1,241 to 1,460 a year
Sunshine on flat ground4.32 kWh per m² a day on average; strongest in April (5.4), weakest in January (3.2)
Noon sun40° above the horizon on 21 December, 87° on 21 June
Daylight10 h 28 min on 21 December, 13 h 48 min on 21 June
Winter parapet shadowA 3 ft parapet on the south edge shades about 3.6 ft of roof at noon on 21 December, and 4.8 ft at 9 am. Panels start beyond it.
Home subsidyPM Surya Ghar central assistance for homes on DCR panels, up to the 3 kW level. Amounts and process.

Sunshine, month by month

3.2J4.1F5.2M5.4A5.2M4.5J4.1J4.4A4.2S4.4O3.9N3.3D
Average daily sunshine on flat ground, kWh per m²; dashed line = yearly average. Source: NASA POWER, 2001–2020 averages at 26.52° N, 88.72° E. Sun angles and shadows are calculated for the solstices.
Local know-how

What is different about Jalpaiguri

Sized to the tea season

Most factories manufacture from about March to November and slow right down in winter. Units banked in the quiet months carry forward, but whatever is still banked on 1 April is lost, so we size to the season the factory actually runs.

Big sheet roofs, done properly

Withering and drying sheds have large metal roofs. Modules go on rails along the sheet profile, with walkways for cleaning, after we have checked the purlins.

Lightning and wet ground

The foothills see frequent thunderstorms. Every plant gets its own earth pits and a lightning arrester, with earthing designed for soil that stays wet half the year.

Winter and monsoon, in the numbers

Short, hazy December days and the long Dooars monsoon both cut output. Our generation band always shows both as they really are.

Where we work

Towns we cover around Jalpaiguri

Homes, shops, hotels, hospitals, schools, mills and factories.

  • Jalpaiguri town, Rajganj & Belakoba
  • Dhupguri, Moynaguri & Falakata
  • Mal, Odlabari & Chalsa
  • Nagrakata, Banarhat & Birpara
  • Kranti, Lataguri & the tea belt
Questions

Asked in Jalpaiguri

Do you install solar for tea factories in the Dooars?

Yes. We are building a plant at a tea factory in Jalpaiguri district now. A tea factory plant is sized to the manufacturing season and the time-of-day bill, because units banked in the quiet winter months lapse on 1 April under the West Bengal rules.

Who handles WBSEDCL net metering in Jalpaiguri?

We do. We prepare and file the net-metering application with WBSEDCL, follow up the inspection and, for plants of 100 kW and above, get the Chief Electrical Inspector’s approval before the plant is switched on.

How much will a rooftop plant generate in Jalpaiguri?

About 3.4 to 4 units per kWp per day averaged over the year on a shadow-free roof, roughly 1,240 to 1,460 units per kWp a year. March to May is strongest; December and January are the weakest, with the monsoon months not far behind.

Solar for Jalpaiguri, in writing

Send your last three electricity bills and a photo of the roof on WhatsApp. You get a written sizing, whether or not you buy.